|
Showcase Projects
California State University
Project:
California State University - Fullerton, CA.
Project Description:
The California State Fullerton campus consists of 19 permanent buildings or building clusters. The newest building is the four-story addition to the Paulina June and George Pollak Library that opened in fall 1996. Other major campus structures are the Titan Student Union, which includes a 1,200-seat events pavilion, a small theater, a food court, a pub, a bowling alley and conference rooms.
Major Highlights:
Multi-building Campus with TCP/IP network communication and multiple Graphical User Interface workstations. Central Plant includes Zero-Emission, Electric Heating and Cooling Central Plant. Chilled Water and hot water thermal energy storage. Building Automation, Lighting, Access Controls.

Building Automation Systems installed and maintained by KDC Systems:
Central Plant |
Building Automation Systems for the heating and cooling systems, variable flow pumping, high efficiency chillers, Chiller waste heat recovery, Chilled water and hot water thermal energy storage. |
Computer Science |
HVAC, Lighting control and monitoring. |
Education Classrooms |
HVAC, Lighting control and monitoring. |
Engineering Complex |
HVAC, Lighting control and monitoring. |
Humanities-Social Sciences |
HVAC, Lighting control and monitoring. |
Langsdorf Hall |
HVAC, Lighting control and monitoring. |
McCarthy Hall |
HVAC, Lighting control and monitoring. |
Performing Arts |
HVAC, Lighting control and monitoring. |
Pollak Library |
HVAC, Lighting, Access control and monitoring. |
Science Laboratory Center |
HVAC, Lighting control and monitoring. |
Sports Complex |
HVAC, Lighting control and monitoring. |
Student Health |
HVAC, Lighting control and monitoring. |
Student Union |
HVAC, Lighting control and monitoring. |
Titan Gymnasium |
HVAC, Lighting control and monitoring. |
University Hall |
HVAC, Lighting control and monitoring. |
Visual Arts |
HVAC, Lighting control and monitoring. |
Back
to top
|
 |